GE Vivid 3 Pro Service Manual page 260

Hide thumbs Also See for Vivid 3 Pro:
Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2300164-100, R
IRECTION
3) In the VME tab, verify that the Comment area indicates that the system is ready to perform the test.
4) Trackball to the Vme Com Test button and press Select. The Vme Com Test LED changes color
as follows:
Yellow: The test is in progress.
Green: The test has been completed and no problems were identified.
Red: Problems were identified during the performance of the test.
5) Review the test results in the Comment area and proceed as follows:
If no problems were identified, proceed to the RFT test, as described in the
Tests (for RFT Configuration)
If no problems were identified but the problem persists, contact your local GE Medical Systems
field engineer for assistance.
If errors were identified but the results were marginal, perform calibration, as described in
Calibration
If errors were identified and the results were not marginal, verify that all image port and PCI
bridge cables are connected and functioning properly, as described in
and Function
engineer for assistance.
7-16
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
7
EVISION
on page 6 - 14, and then repeat the VME test.
(Theory). If the problem persists, contact your local GE Medical Systems field
Section 7-3 - Performing Front End (FE) Diagnostics
V
IVID
section, on page 7-17.
™ 3 P
/V
™ 3 S
RO
IVID
ERVICE
RFT Diagnostic
Chapter 5 - Components
M
ANUAL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid 3

Table of Contents