Toro Z Master 7500-D Series Service Manual page 92

Hide thumbs Also See for Z Master 7500-D Series:
Table of Contents

Advertisement

Roll Over Protection System (ROPS) (Cont.)
Installation
1. Install the lower ROPS tubes onto the machine.
2. Install the four lower bolts securing the lower ROPS tubes to the machine. Torque to 100-110 ft-lbs. (135-149
Nm).
3. Install the four upper bolts securing the lower ROPS tubes to the machine. Torque to 100-110 ft-lbs. (135-149
Nm).
4. Install the two spacers, one on each side, in the hole for the lower ROPS.
NOTE: Will need assistance to continue.
5. Lift the ROPS onto the machine, in the down position.
6. Install the two carriage bolts, one on each side.
7. Lift the ROPS to the upward position.
8. Connect the vent lines to the upper ROPS tube on both sides of the machine.
9. Place the heat deflector panel onto the machine.
10. Install three tree clips securing the heat deflector panel to the machine.
11. Install the wire harness retainer to the heat deflector panel using three zip ties.
12. Install the hood onto the machine,
13. Flip the operator's seat down and slide into position.
Z Master 7500-D Series Service Manual
March 2018 - Digital Edition
CHASSIS
see "Engine Cover Installation," chapter 5, page 5-41.
5-39
Table of Contents

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7406074064740727407474096

Table of Contents