CHASSIS
Roll Over Protection System (ROPS) (Cont.)
Removal (Cont.)
6. Disconnect the vent lines from the upper ROPS tube on both sides of the machine (Figure 28).
Figure 28
7. Lay the ROPS down.
8. Remove the two carriage bolts, one on each side.
NOTE: Will need assistance to continue.
9. Lift the ROPs straight up to remove.
10. Remove the two spacers from lower ROPS and set aside (Figure 29).
Figure 29
5-37
Z Master 7500-D Series Service Manual
Table of Contents
March 2018 - Digital Edition