Toro Z Master 7500-D Series Service Manual page 53

Hide thumbs Also See for Z Master 7500-D Series:
Table of Contents

Advertisement

ENGINE
Yanmar Engine Replacement (Cont.)
Installation (Cont.)
50. Install the left and right side covers,
see "Left Tank Cover Installation," chapter 5, page 5-18
and
see
"Right Tank Cover Installation," chapter 5, page 5-20.
51. Install the operator's floor pan onto the machine.
52. Refill radiator with proper coolant as outlined in the operator's manual.
53. Connect the positive terminal first, then the negative terminal last to the battery.
54. Check the hydraulic fluid reservoir level.
55. Perform visual inspection prior to test run.
56. Start the machine to verify no leaks are present.
57. Purge the hydraulics,
see "Charging the Hydraulic System," chapter 7, page 7-17.
4-31
Z Master 7500-D Series Service Manual
Table of Contents
March 2018 - Digital Edition

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7406074064740727407474096

Table of Contents