ENGINE
Yanmar Engine Replacement (Cont.)
Installation (Cont.)
5. When aligned, loosely install the two transmission mounts and finger tighten.
NOTE: Make sure transmission iso-mounts and bushings are in place before bolt install (Figure 39).
Figure 39
6. Slowly lower the engine until the engine mounts are aligned.
7. Install the two engine mount bolts and tighten.
8. Tighten the two transmission mount bolts.
9. Connect fuel pump harness.
10. Connect two fuel lines to fuel pump and water separator.
11. Connect the two fuel lines and return to the fuel tank on each side.
12. Install the drive shaft.
13. Install the hydraulic line onto the bottom of the auxiliary pump.
14. Loosely install the bulk head plate.
15. Place, but do not fully install, the metal transmission cooler lines.
16. Install the radiator brackets with six bolts (three per side).
17. Install the radiator fan shroud and radiator, secure the shroud with four screws (two per side) and secure the
upper radiator support with two fasteners (one per side).
4-26
Z Master 7500-D Series Service Manual
Table of Contents
March 2018 - Digital Edition

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7406074064740727407474096

Table of Contents