Toro Z Master 7500-D Series Service Manual page 73

Hide thumbs Also See for Z Master 7500-D Series:
Table of Contents

Advertisement

Right Tank Cover (Cont.)
Installation
1. Raise the hood to install the right tank cover.
2. Ensure proper harness routing for the control panel (Figure 14).
3. Align fuel line routing with right tank cover (Figure 15).
4. Thread harness through the right tank cover while placing on the machine.
5. Insert the two washers and two screws loosely on the inside of the machine.
NOTE: Only the inside screws use washers
6. Insert the four screws located on the outside of the of the left tank cover and tighten all six fasteners.
5-20
Table of Contents
CHASSIS
Figure 14
Figure 15
Z Master 7500-D Series Service Manual
March 2018 - Digital Edition

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7406074064740727407474096

Table of Contents