Toro Z Master 7500-D Series Service Manual page 50

Hide thumbs Also See for Z Master 7500-D Series:
Table of Contents

Advertisement

Yanmar Engine Replacement (Cont.)
Installation (Cont.)
29. Connect the electrical lines (Figure 40).
30. Attach and tighten the vent lines to the torque motors. Torque to 30 ± 3 ft-lbs. (40 ± 4 Nm).
NOTE: Ensure proper orientation of vent lines to avoid unwanted contact.
31. Attach torque motor hydraulic lines to transmission. Torque to 67 ± 7 ft-lbs. (90 ± 9 Nm).
32. Install the air intake hose from the radiator bracket to the air cleaner.
33. Place the battery on the machine and secure the battery with a bolt. Do NOT connect the battery.
4-28
Table of Contents
ENGINE
Figure 40
WARNING
When removing or installing the battery, do not allow
the battery terminals to touch any metal parts of the
machine. Do not allow metal tools to short between the
battery terminals and metal parts of the machine.
Z Master 7500-D Series Service Manual
March 2018 - Digital Edition

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7406074064740727407474096

Table of Contents