Hardi SMARTCOM ISOBUS UT SW A.2.2 Series Original Instruction Book page 103

Table of Contents

Advertisement

FastFlush
1. Go to AutoWash by pressing
2. Press
to enter FastFlush.
3. Begin driving in the field just sprayed. Spray at normal driving
speed to avoid overdosing.
4. Press
to start the program.
5. In field (A), drive approximately 800 metres (9 km/h) until FastFlush
has finished.
μ
ATTENTION! For sprayers with FlexCapacity pump, the controller
prompts when to turn the pump ON/OFF during the FastFlush/MultiRinse program.
÷
NOTE! External fill hoses from injector to External filling coupler and to suction SmartValve is not flushed. This contains
approximately 8 litres.
The following diagram show the valve positions during the FastFlush program.
Pre-start MainTank emptying
11:18
12:18
13:18
14:18
15:18
17:18
18:18
.
Pressure
SmartValve
A
Suction
Main
Spray
SmartValve
ON/OFF
5 - Operation
CycloneFilter
Agitation
Boost Line
Valve
Valve
103

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SMARTCOM ISOBUS UT SW A.2.2 Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Smartcom isobus ut sw a.2.2.53

Table of Contents