Project Setup; Standard Counts - Troxler Enhanced RoadReader Plus 3451 Manual Of Operation And Instruction

Surface moisture-density gauge
Table of Contents

Advertisement

Figure 7–7. Gauge Constants Display

PROJECT SETUP

The Data Manager enables the operator to view the configuration
(setup) of the active project, including the software version,
measurement units, count time, measurement mode, target values,
and offset values. To view the project configuration, press the
〈Project Setup〉 button on the Print Active Project Menu. The
Data Manager software displays the active setup, as shown in Figure
7–8.

STANDARD COUNTS

To view the results of the most recent count, press the
〈Standard Counts〉 button on the Print Active Project Menu.
The Data Manager software displays the standard counts, as shown
in Figure 7–9. For more information on standard counts, refer to
page 4–2.
7–
Model 3451

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Enhanced RoadReader Plus 3451 and is the answer not in the manual?

Questions and answers

Table of Contents