13) Install a new Potential Sensor [1] to the Primary Charging Rail.
- 1 Harness [2]
- 2 Wire Saddles [3]
- 2 Harness Guides [4]
- 1 Screw [5]
14) Install a new Potential Sensor Protection Sheet [6].
[Caution] When installing, remove the release paper, and align the Potential Sensor Protection Sheet with the marking line [A] to affix it (be sure that the gap [B]
between the marking line and the release paper is less than 0.5 mm).
15) Install the Primary Charging Rail to the host machine.
16) Install the removed parts in reverse order.
1.1.7.1.66 Points to note after releasing pressure of ITB
0031-6465
[ Manual-related ]
Description
Please explain the actions to take after turning the ITB Pressure Release Lever [1] and releasing the pressure of ITB.