[Reference] When installing, insert the Primary Charging Rail [1] at the angle as shown in the figure, and then insert the 2 bosses [2] in the boss holes [3] of the
host machine.
2) Install the ITB Unit to the machine.
3) Connect a new cable [3] to the connector [2] of the new Potential Sensor [1].
4) Install the Potential Sensor [1] to the 2 pin electrodes [4] for checking the Potential Sensor.
- 1 Connector [2]
- 1 Screw [5]
[Caution] Tightly secure using screws to prevent the Potential Sensor from coming loose.