Remove the PCI Mezzanine
CPU modules
■
Flash modules and Flash module cable
■
ESM riser and ESM
■
Battery
■
It is not necessary to remove the PCI mezzanine for other components. However, when you
remove the PCI mezzanine, you make additional working space available.
"Remove the PCI Mezzanine" on page 102
■
"Install the PCI Mezzanine" on page 104
■
Related Information
"Replacing PCIe2 Cards" on page 112
■
Remove the PCI Mezzanine
Note -
remain in place when removing the PCI Mezzanine.
1.
Prepare the server for service.
See
"Preparing the Server for Component Replacement" on page
2.
Disconnect all I/O cables from the rear of the PCI mezzanine.
These cables should have been removed prior to removing the server from the rack. These
cables include the external SAS cable, alarm cable, and any I/O cables connected to installed
PCIe cards.
3.
Disconnect the following PCI mezzanine cables:
LED board cable
■
Fan tray 1 power cable
■
Power cable from PDB
■
Internal SAS HBA cable
■
Fan tray 2 power cable
■
102
Sun Netra X4270 Server • September 2015
PCIe2 cards installed in slots 4 and 5, as well as the installed SAS controller HBA, can