JUKI APW-895 Engineer's Manual page 73

Lockstitch, automatic welting machine, parallel pocket with flap sewing
Table of Contents

Advertisement

Adjustment Procedures
6. Fix the gasket
and the hose base
means of the setscrew
The worker side should be fixed with the stud
done both on the right and left.
7. Fix the stud connector plate
setscrew
.
8. Fix the hose
to the hose base
9. Insert the pipe spacer
hose
by means of the hose band
10. This work shall be done both on the right and left.
11. Insert the pipe spacer
hose
by means of the hose band
12. Pinch the T-shaped joint
the stud connector plate
13. Install the solenoid valve connectors and the air piping.
Refer also to SA-119 of the parts list.
14. Connect Section A to the suction motor (SA-127).
to the suction base
and the washer
.
. This work shall be
to the stud
by means of the hose band
in the T-shaped joint
.
in the T-shaped joint
.
by means of the clamp
by means of the setscrew
– 68 –
Results of Improper Adjustment
by
by means of the
.
and fasten the
and fasten the
and fasten it to
.

Advertisement

Table of Contents
loading

Table of Contents