Pre and Post-Repair Procedures

Post Repair Procedures

Post Repair Procedures
When an assembly is replaced, ignore any error messages that appear
until after the Utilities and Additional Tasks listed in
Table 16-3

N5166B, N5171B/72B/81B/82B

Most replacement assemblies are fully calibrated and do not require any
adjustments. The factory completes a performance test on each replacement
assembly, so a comprehensive performance test is not required upon receipt
and installation of an assembly. However, a manual operational performance
verification is recommended to check basic operation.
Table 16-2
verification tests that need to be performed after an assembly is replaced.

N5173B/83B

Because of the interdependency between assemblies, replacement assemblies
are partly calibrated and require limited adjustments to optimize performance.
Table 16-3
verification tests that need to be performed after an assembly is replaced.
Post repair procedures listed in
performed in the order in which they are listed in the table.
414
have been completed.
lists the utilities, additional tasks, adjustments, and performance
lists the utilities, additional tasks, adjustments, and performance
Table 16-2
Keysight CXG, EXG, and MXG X-Series Signal Generators Service Guide
Table 16-2
or
and
Table 16-3
need to be