Rf Connector; Tools Required; Removal Procedure; Replacement Procedure - Keysight Technologies X Series Service Manual

Signal generators
Hide thumbs Also See for X Series:
Table of Contents

Advertisement

Assembly Replacement

RF Connector

RF Connector

Tools Required

— T-10 driver
— 5/16" open-ended wrench

Removal Procedure

Refer to
1. Disconnect the power cord.
2. Remove the outer cover from the signal generator. Refer to
3. Remove the front panel from the signal generator. Refer to
4. Using the 5/16" open-ended wrench, disconnect W9 (2) from the RF
5. Using the T-10 driver, remove the three screws (1) that attach the RF
6. Remove the RF connector.

Replacement Procedure

1. Reverse the order of the removal procedure.
2. Recommended torque for the three screws is 9 in–lbs.
3. Recommended torque for W9 cable is 9 in–lbs.
388
Figure 15-34
for this procedure.
on page
336.
on page
342.
connector.
connector to the chassis.
Keysight CXG, EXG, and MXG X-Series Signal Generators Service Guide
"Outer Cover"
"Front-Panel"

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents