This chapter provides information that will enable you to return an instrument
to full operation following the replacement of any instrument assembly. The
following tables list the adjustments and performance verification tests needed
after an assembly replacement.
After an assembly is replaced, find the assembly that has been replaced at the
top of the table, and then perform the recommended adjustments and
performance verification tests. Making the recommended adjustments and/or
performance verification tests doesn't guarantee all published specifications
are being met. Only a full instrument calibration will do this.
For the instrument to meet performance specifications and for accurate self- test results, allow a
warm up period of one hour within an operational temperature range of 0 to 55 °C. For more
information, refer to the UXG signal generator Data Sheet.

Assemblies A1 - A19

After replacing assemblies A1 - A19:
— for Post Repair Adjustments, refer to the table on
— for Post Repair Performance Tests, refer to the table on
157
page 160
page 161

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N5191aN5193a

Table of Contents