Installation

Installation
Installation
Installation of this equipment involves potentially
hazardous procedures. Only trained and qualified
personnel who have read and who understand
the information in this manual should install this
equipment.

Location

Location
Location
When selecting the location for the equipment, keep
the following in mind:
• There must be sufficient space on all sides of
the equipment for installation, operator access,
maintenance, and air circulation.
• Ensure that the mounting surface and mounting
hardware are strong enough to support the weight
of the equipment, fluid, hoses, and stress caused
during operation.
• There must be a start/stop control (C)
within easy reach of the equipment.
See
Typical Installation, page
Mount the
the Pump
Pump
Mount
Mount
the
Pump
During installation pumps could slide together
causing a potential pinch hazard. Use caution
when installing the pumps.
See
See
See Figures
Figures 2 2 2 and
Figures
and 3. 3. 3.
and
1. Place each pump (4) onto the stand frame (6)
and align the mounting holes of the motor stand
bracket (2) with the stand frame (6). Install
washers (13) and bolts (14) but do not tighten.
3A3453H
12.
2. Install the inlet manifold (3). Place gaskets (15)
over the inlet ports and attach manifold (3) using
clamps (7).
3. Install the outlet manifold. Place gaskets (15)
over the outlet ports and attach manifold (3)
using clamps (7).
4. Install the o-ring (34c) and pressure transducer
(34b) on the transducer manifold (34a). Use
the gasket (34e) and clamp (34d) to attach the
transducer assembly to the top manifold (3).
5. Tighten bolts (14) to secure the pumps to the
stand.
Models with
with Sealed
Sealed Lowers:
6. Models
Models
with
Sealed
(12) on both pumps by engaging the bottom lips
with the groove in the top plate. Snap the two
shields together.
Figure 1
7. See
Mounting Hole Patterns, page
the stand to the floor with M19 (5/8 in.) bolts
which engage at least 152 mm (6 in.) into the
concrete floor to prevent the pump from tipping.
8. Level the stand as required, using shims.
Installation
Lowers: Install the shields
Lowers:
59. Secure
7