Uss Connection For Op2, Vd1 - Siemens SIMADYN D Hardware Manual

Hide thumbs Also See for SIMADYN D:
Table of Contents

Advertisement

Aotewell Ltd

6.8.2 USS connection for OP2, VD1

Bus termination
USS bus with
connection
Hardware - SIMADYN D
Edition 12.2004
HongKong|UK|China
www.aotewell.com
Connecting cables for the OP2 operator control device or the VD1 numerical
display can be assembled using the SM8 parts set (for SS4) or an
appropriate parts set for OP2/VD1 (OP2: Parts set SM5) according to the
following diagrams.
A 4-core screened round cable is required (e. g. LICYC 4*0,5, Metrofunk).
In order to increase the data integrity, the bus cable at both ends (at the first
and last nodes) must be terminated using a resistor network:
• an 150Ω resistor between the RS485+, RS485- data signal lines
• one 390Ω resistor each from the data signal cables RS485+ to +5 V and
from RS485- to ground to define a quiescent signal level when a node is
not transmitting („basis network")
For the VD1 numerical display, the bus termination (including basis
network) is already integrated in the unit. These can be activated using the
two DIL switches S1/S2.
390R
390R
150R
SS4
Fig. 6-10 SS4 at OP2 and VD1; with bus terminating circuitry
sales@aotewell.com
Communications support modules
RS485+
RS485-
Industry Automation
VD1
S1 - ON
S2 - ON
150R
OP2
6-33
+86-755-8660-6182
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents