Preparing The System For Operation - IBM Power System Series Manual

Temple's zeppelin procedures for install, remove, replace
Hide thumbs Also See for Power System Series:
Table of Contents

Advertisement

Preparing the system for operation after removing and replacing the control panel in the
9040-MR9
To prepare the system for operation after removing and replacing a control panel, complete the steps in
this procedure.
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Position the cover (A) on the front of the system unit as shown in the following figure, so that the four
pins (B) on the system match the four holes at the rear of the cover.
Press the tabs (C) to snap the cover into position.
Figure 5: Installing the front cover
3. Check that the power LED (A), as shown in the following figure, is on.
Control panel and control panel display for the 9040-MR9 5

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power System Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Power system e950 9040-mr9

Table of Contents

Save PDF