Figure 33: Replacing the front USB port connector
Preparing the system for operation after removing or replacing the front USB cable in the
9040-MR9
To prepare the system for operation after removing or replacing the front USB cable, complete the steps in
this procedure.
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. To replace the disk drive backplane, complete the following steps:
Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the
rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull out
more than one drawer at a time.
44 Power Systems: Temple's Zeppelin procedures for install, remove, replace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system e950 9040-mr9

Table of Contents