IBM Power System Series Manual page 110

Temple's zeppelin procedures for install, remove, replace
Hide thumbs Also See for Power System Series:
Table of Contents

Advertisement

Figure 84: Removing the service access cover
6. Place the SAS cables (A) against the foam of the SAS cable support (B) as shown in the following
figure. With your fingers holding the SAS cables against the foam, lower the SAS cable support (B)
and SAS cables straight down between the alignment pins (C).
The foam holds the cables against the side of the system and prevents air from blowing through the
side channel. Do not simply press the support (B) down in the channel on top of the cables.
106 Power Systems: Temple's Zeppelin procedures for install, remove, replace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system e950 9040-mr9

Table of Contents