IBM Power System Series Manual page 175

Temple's zeppelin procedures for install, remove, replace
Hide thumbs Also See for Power System Series:
Table of Contents

Advertisement

Figure 151: Installing the service access cover
43. Route the SAS cables around to the front of the system.
SAS cables in the 9040-MR9 171

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system e950 9040-mr9

Table of Contents