Power Systems
Installing the IBM Power System S922
(9009-22A and 9009-22G), IBM Power
System H922 (9223-22H), or IBM Power
System H922S (9223-22S)
IBM
GI11-9931-04

Advertisement

Table of Contents
loading

Summary of Contents for IBM S922

  • Page 1 Power Systems Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) GI11-9931-04...
  • Page 2 “Notices” on page 31, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, Z125–5823. This edition applies to IBM Power Systems servers that contain the POWER9 processor and to all associated models. ©...
  • Page 3: Table Of Contents

    Contents Safety notices......................v Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)....1 Installing a rack-based server........................1 Prerequisite for installing the rack-mounted server................1 Completing inventory for your server....................1 Determining and marking the location in the rack................
  • Page 5: Safety Notices

    Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: • If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
  • Page 6 Always install servers and optional devices starting from the bottom of the rack cabinet. vi Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 7 • Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). •...
  • Page 8 DANGER: Hazardous voltage, current, or energy levels are present inside any component that has this label attached. Do not open any cover or barrier that contains this label. (L001) (L002) viii Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 9 DANGER: Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices. In addition, do not lean on rack-mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). Stability hazard: •...
  • Page 10 DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) (L007) CAUTION: A hot surface nearby. (L007) x Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 11 Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local regulations. In the United States, IBM has a process for the collection of this battery. For information, call 1-800-426-4333. Have the IBM part number for the battery unit available when you call.
  • Page 12 Be sure winch is locked in position before releasing handle. Read instruction page before operating this winch. Never allow winch to unwind freely. xii Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 13 Freewheeling will cause uneven cable wrapping around winch drum, damage cable, and may cause serious injury. • This TOOL must be maintained correctly for IBM Service personnel to use it. IBM shall inspect condition and verify maintenance history before operation. Personnel reserve the right not to use TOOL if inadequate.
  • Page 14 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 15: Installing The Ibm Power System S922 (9009-22A And 9009-22G), Ibm Power System H922 (9223-22H), Or Ibm Power System H922S (9223-22S)

    You might need to read the following documents before you begin to install the server: • The latest version of this document is maintained online. See Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) (http://www.ibm.com/support/knowledgecenter/POWER9/p9egh/p9egh_roadmap.htm).
  • Page 16: Determining And Marking The Location In The Rack

    3. If necessary, remove the filler panels to allow access to the inside of the rack enclosure where you plan to place the unit. For details, see Figure 1 on page 3. 2 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 17 9. Mark the bottom hole in the EIA unit and the top hole in the EIA unit. 10. Mark the corresponding holes on the left side of the rack. Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 3...
  • Page 18: Attaching The Mounting Hardware To The Rack

    Do not install mismatched hardware by using washers or spacers. If you do not have the correct rails and fittings for your rack, contact your IBM reseller. To install the rack-mounting hardware into the rack, complete the following steps: Procedure 1.
  • Page 19 3. Swivel the rail retention bracket out (3) and pull the front of the rail toward the front of the rack, until the pins are aligned with the correct holes in the rack (4). Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 5...
  • Page 20 Figure 4. Swiveling the retention bracket and aligning the pins 4. Swivel the rail retention bracket so that it locks onto the rack flange (5). 6 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 21: Installing The System Into The Rack

    5 seconds. CAUTION: This system requires three people to install the system into the rack. Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 7...
  • Page 22 3. Push the release buttons on both rails (1) and push the server (2) all the way into the rack until it clicks into place. 8 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 23: Installing The Cable-Management Arm

    Item Description Inner cable management arm tab Inner mounting bracket Outer cable management arm tab Outer mounting bracket Extension tab Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 9...
  • Page 24 (1) so that it swivels in the opposite direction (2). 10 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 25 4. On the opposite side of the rack, insert the extension tab (E) to the outer cable management arm tab (F) until it clicks into place. Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 11...
  • Page 26: Cabling The Server And Setting Up A Console

    “Cabling the server and mouse (KVM) cables equipped with keyboard, with KVM video, and mouse” on page 18 12 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 27 These attributes are the default settings for the diagnostic programs. Be sure that your terminal is set according to these attributes before proceeding to the next step. Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 13...
  • Page 28 2. To learn how to connect an HMC to a private network so that it can manage more than one managed system, see HMC network connections (http://www.ibm.com/support/knowledgecenter/POWER9/ p9hai/p9hai_netconhmc.htm). Notes: 14 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 29 4. Continue with “Cabling the server and connecting expansion units” on page 18. Cabling the server and accessing Operations Console You can use Operations Console to manage a server that is running the IBM i operating system even if you do not have logical partitions.
  • Page 30 This might indicate that the system is not preinstalled with IBM i and you must set the console type to LAN. 6. Perform this step if the system is not preinstalled with IBM i. For setting the console type to LAN, complete the following steps: a.
  • Page 31 A603500C. These SRCs indicate that drive and disk checks are being performed to change the console type. Note: 65+21+11 functions are no longer needed unless directed by IBM support. The functions to set an adapter location are now performed automatically by the Licensed Internal Code.
  • Page 32: Cabling The Server And Connecting Expansion Units

    Plug the system power cords and the power cords for any other attached devices into the power source. 18 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 33: Completing The Server Setup

    For more information about setting passwords for the managed system by using the HMC, see Setting passwords for the managed system (http://www.ibm.com/support/knowledgecenter/POWER9/ p9hai/p9hai_setpassword_enh.htm). Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 19...
  • Page 34 For more information about starting a system or logical partition by using the HMC, see Starting a system or logical partition by using the HMC. 20 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 35 • Install the VIOS operating system. For instructions, see Installing VIOS (https://www.ibm.com/ support/knowledgecenter/POWER9/p9hb1/p9hb1_vios_install.htm). • Install the IBM i operating system. For instructions, see Installing the IBM i operating system (http://www.ibm.com/support/knowledgecenter/POWER9/p9hdx/p9hdx_ibmi.htm). 11. You have now completed the steps to install your server.
  • Page 36: Setting Up A Preinstalled Server

    7. You have now completed the steps to install your server. Setting up a preinstalled server Use this information to learn about setting up a IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) server that is preinstalled in the rack.
  • Page 37 • The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location to view the service and support contact information. Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 23...
  • Page 38 “Cabling the server and mouse (KVM) cables equipped with keyboard, with KVM video, and mouse” on page 18 24 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 39 The Hardware Management Console (HMC) controls managed systems, including the management of logical partitions, the creation of a virtual environment, and the use of capacity on demand. Using service Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 25...
  • Page 40 4. Power on the console. 5. Continue with “Cabling the server and connecting expansion units” on page 18. 26 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 41 To control speculative execution by using the ASMI to address the Spectre and Meltdown vulnerabilities, complete the following steps: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S) 27...
  • Page 42 • Install the VIOS operating system. For instructions, see Installing VIOS (https://www.ibm.com/ support/knowledgecenter/POWER9/p9hb1/p9hb1_vios_install.htm). • Install the IBM i operating system. For instructions, see Installing the IBM i operating system (http:// www.ibm.com/support/knowledgecenter/POWER9/p9hdx/p9hdx_ibmi.htm). 9. You have now completed the steps to install your server.
  • Page 43 • Install the VIOS operating system. For instructions, see Installing VIOS (http://www.ibm.com/ support/knowledgecenter/POWER9/p9hch/p9hch_installvios.htm). • Install the IBM i operating system. For instructions, see Installing the IBM i operating system (http:// www.ibm.com/support/knowledgecenter/POWER9/p9hdx/p9hdx_ibmi.htm). 5. Update the system firmware, if required. Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or...
  • Page 44 • If you are using VIOS, see Updating the Virtual I/O Server (http://www.ibm.com/support/ knowledgecenter/POWER9/p9hb1/p9hb1_vios_managing_updating.htm). 6. You have now completed the steps to install your server. 30 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 45: Notices

    Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
  • Page 46: Accessibility Features For Ibm Power Systems Servers

    This product uses standard navigation keys. Interface information The IBM Power Systems servers user interfaces do not have content that flashes 2 - 55 times per second. The IBM Power Systems servers web user interface relies on cascading style sheets to render content properly and to provide a usable experience.
  • Page 47: Privacy Policy Considerations

    Contact the vendor for accessibility information about its products. Related accessibility information In addition to standard IBM help desk and support websites, IBM has a TTY telephone service for use by deaf or hard of hearing customers to access sales and support services:...
  • Page 48: Electronic Emission Notices

    Electronic emission notices Class A Notices The following Class A statements apply to the IBM servers that contain the POWER9 processor and its features unless designated as electromagnetic compatibility (EMC) Class B in the feature information. When attaching a monitor to the equipment, you must use the designated monitor cable and any interference suppression devices supplied with the monitor.
  • Page 49 Tel: 914-499-1900 Der verantwortliche Ansprechpartner des Herstellers in der EU ist: IBM Deutschland GmbH Technical Relations Europe, Abteilung M456 IBM-Allee 1, 71139 Ehningen, Germany Tel: +49 (0) 800 225 5426 email: HalloIBM@de.ibm.com Generelle Informationen: Das Gerät erfüllt die Schutzanforderungen nach EN 55024 und EN 55022 / EN 55032 Klasse A.
  • Page 50 Proper cables and connectors are available from IBM-authorized dealers. IBM is not responsible for any radio or television interference caused by using other than recommended cables and connectors 36 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 51: Class B Notices

    Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
  • Page 52 This statement applies to products greater than 20 A per phase, three-phase. Japan Voluntary Control Council for Interference (VCCI) Notice 38 Power Systems: Installing the IBM Power System S922 (9009-22A and 9009-22G), IBM Power System H922 (9223-22H), or IBM Power System H922S (9223-22S)
  • Page 53: Terms And Conditions

    Permissions for the use of these publications are granted subject to the following terms and conditions. Applicability: These terms and conditions are in addition to any terms of use for the IBM website. Personal Use: You may reproduce these publications for your personal, noncommercial use provided that all proprietary notices are preserved.
  • Page 54 IBM reserves the right to withdraw the permissions granted herein whenever, in its discretion, the use of the publications is detrimental to its interest or, as determined by IBM, the above instructions are not being properly followed.
  • Page 56 IBM® Part Number: 03GM221 GI11-9931-04...