IBM Power System Series Manual page 156

Temple's zeppelin procedures for install, remove, replace
Hide thumbs Also See for Power System Series:
Table of Contents

Advertisement

Figure 132: Tightening the captive screws on the power midplane bulkhead
d) Reconnect the cable to its connector on the power midplane.
152 Power Systems: Temple's Zeppelin procedures for install, remove, replace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system e950 9040-mr9

Table of Contents