Preparing The System For Operation After Replacing The System Backplane - IBM Power System 8335-GTW Manual

Servicing
Hide thumbs Also See for Power System 8335-GTW:
Table of Contents

Advertisement

For instructions, see "Removing and replacing memory modules in the 8335-GTW or 8335-GTX
system" on page 102.
23. Replace the air baffles (A) and (B) as shown in Figure 134 on page 149.
Carefully move the baffles around the hoses.
Figure 134. Replacing the memory air baffles
Preparing the system for operation after removing and replacing the system backplane in
the 8335-GTW
To prepare the system for operation after replacing the system backplane, complete the steps in this
procedure.
Procedure
1. Prepare the system for operation.
For instructions, see "Preparing the 8335-GTC, 8335-GTG, 8335-GTH, 8335-GTW, or 8335-GTX
system for operation after you remove and replace internal parts" on page 202.
2. Verify that the jumper is set to water-cooled by using the following command. The system must be
powered on.
openbmctool -U <username> -P <password> -H <BMC IP address or BMC host name> fru print | grep -i
watercooled
Removing and replacing parts in the 8335-GTW or 8335-GTX 149

Advertisement

Table of Contents
loading

Table of Contents