Preparing The System For Operation After Removing And Replacing Internal Parts For The 8348-21C - IBM Power Systems S812LC 8348-21C Installation Manual

Installing the system and ordered parts
Hide thumbs Also See for Power Systems S812LC 8348-21C:
Table of Contents

Advertisement

DANGER: Multiple power cords. The product might be equipped with multiple power cords. To
remove all hazardous voltages, disconnect all power cords. (L003)
8. Place the system into the service position. For instructions, see "Placing an 8348-21C system into the
service position" on page 65.
(R008)
CAUTION: Do not place any object on top of a rack-mounted device unless that rack-mounted
device is intended for use as a shelf. (R008)
(L012)
CAUTION: Pinch hazard. (L012)
9. Remove the service access cover. For instructions, see "Removing the service access cover from an
8348-21C system" on page 67.
Preparing the system for operation after removing and replacing
internal parts for the 8348-21C
Learn how to prepare the IBM Power System S812LC (8348-21C) system for operation after removing and
replacing internal parts.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap attached. If not, attach it now.
2. Replace the service access cover. For instructions, see "Installing the service access cover on an
8348-21C system" on page 68.
3. Place the system into the operating position. For instructions, see "Placing an 8348-21C system into
the operating position" on page 66.
(L012)
or
Installing and configuring the system
61

Advertisement

Table of Contents
loading

Table of Contents