IBM Power System Series Manual page 136

Temple's zeppelin procedures for install, remove, replace
Hide thumbs Also See for Power System Series:
Table of Contents

Advertisement

Figure 109: Pulling the blue rail latch
b) Each side of each clip is stamped with an L and an R. For the right side of the rail, ensure that the
side stamped R is facing outward.
Figure 110: Right system-to-rail locking clip
c) While holding the blue latch (A), rotate the clip (B) into the rail until it clicks into place.
132 Power Systems: Temple's Zeppelin procedures for install, remove, replace

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system e950 9040-mr9

Table of Contents