1. Nut
2. Washer
3. R-clamp
2.
Secure the boom hoses to the front side of the
center boom section
with 1 R-clamp, 1 shoulder bolt (5/16 x 1 inch), 1
locknut (5/16 inch), and 1 washer (5/16 inch).
3.
Install the boom section hose over the barbed
T-fitting at the boom section and secure the hose
with a hose clamp
Note:
Apply a coat of liquid soap to the hose
barb of the tee fitting to ease installation of the
hose.
4.
Repeat steps
1
through
boom section on the other side of the sprayer.
Hose—Right Boom Section
4. Shoulder bolt
5. T-fitting
6. Hose clamp
(Figure 42
and
Figure
(Figure 42
and
Figure
3
on the hose to the
Figure 43
43)
43).
35
7. Right-boom hose
8. Right-section valve
g213727