Connection To The Power Supply; After Successful Commissioning - Funkwerk artem ComPoint Butterfly Manual

Table of Contents

Advertisement

After Successful Commissioning

Connection to the Power Supply

After Successful Commissioning
1. Insert the appropriate plug of the power supply into a
mains socket (230 V, 50 Hz).
2. Then, insert the power supply into the jack of the
ComPoint Butterfly labeled Power.
3. The Power LED indicates whether the ComPoint is prop-
erly connected to the power supply.
After connecting the ComPoint to the mains power supply and
setting up a connection to your Ethernet, it is ready for use.
Note:
To adapt the radio client to already existing configurations of
wireless networks, specific settings of the communications
parameters are required.
Prerequisite:
To be able to configure these settings, you have to start the config-
uration via a browser. For this purpose, the ComPoint has to be
assigned an IP address via the artem ComPoint Manager
(artem_CPM.exe) (see
Page
1–15).
Section The Basic Configuration,
1-7