Calibrate The Meter; Set The Modbus Addresses; Update The Software - Graco ProControl 1KE Plus Instructions-Parts List Manual

Models for management of fluid and air
Table of Contents

Advertisement

Calibrate the
the Meter
Calibrate
Calibrate
the
NOTE:
NOTE: See
NOTE:
Setup Screen 4: Calibration, page
further screen information, if needed.
When to to to Calibrate
Calibrate
When
When
Calibrate
• The first time the system is operated.
• Whenever new materials are used in the system,
especially if the materials have viscosities that
differ significantly.
• As part of regular maintenance to retain meter
accuracy.
• Whenever a flow meter is serviced or replaced.
Read Before
Before Calibration
Calibration
Read
Read
Before
Calibration
• Meter k-factor on
Setup Screen 4: Calibration, page
automatically after the calibration procedure
is completed. You also may manually edit the
k-factor if desired.
• All values on this screen are in cc or cc/pulse,
regardless of the units set in the other Setup
screens.
• Before calibrating the meter, be sure the system
is primed with material.
• Disable alarms before calibration.
Calibration Steps
Calibration
Calibration
Steps
Steps
1. Press
to enter Setup Mode.
2. Press
to move to Setup Screen 4.
3. Press
to enter the screen.
4. Press
to begin the calibration.
5. Dispense about 300–500 cc of material into a
graduated cylinder. The amount the system
measures will display in the measured volume
field
.
6. Press
to end the calibration.
3A6948A
Meter
Meter
45, for
45, is updated
7. Press
to get to the dispensed volume field
, then press
the amount of material in the cylinder.
8. After the volume is entered, the system calculates
the new k-factor
Screen 4.
NOTE:
NOTE: To clear the counter and begin the
NOTE:
calibration again, press
another screen, then return to Setup Screen 4
and start over. If you press
the screen, the counter will continue from where
it is, without clearing.
9. Press
to exit the screen.
10. Press
to exit Setup Mode.
Set the
the Modbus
Modbus Addresses
Set
Set
the
Modbus
Setup Screen
Screen 11
11. By default, the Modbus
See Setup
Setup
Screen
11
is set to Off
. If you need the Modbus,
set the Modbus mode to SLAVE
The address value is between 1 and 247.
The modbus address corresponds to the
address of the ProControl 1KE Plus. See
Appendix A - Modbus Variable Map, page
more information.
Update the
the Software
Update
Update
the
Software updates are installed using a software token
(PN 25B324). Manual 3A1244 will accompany any
necessary software updates. Follow all instructions
and warnings in Manual 3A1244 to update your
ProControl 1KE Plus software.

Calibrate the Meter

to enter the field. Enter
and shows it on Setup
, move briefly to
without leaving
Addresses
Addresses
.
81, for
Software
Software
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Procontrol 1ke plus adcm24l097

Table of Contents