Installation - Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual

Energy storage system ess
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

Your Smart Energy

Installation

Figure 7 Limit Distance of Installation to Neighboring Objects
Where the top of the SMILE5 is within 1200 mm of the ceiling or structure above the
SMILE5, the ceiling or structure surface shall be suitably non-combustible for an area
of 600 mm past the extremities of the SMILE5.
SMILE5 shall be mounted with the highest point no greater than 2.2 m above the floor
or platform.
2.2 Installation
Figure 8 Unpacking the inverter and battery
Step 1: Remove the battery and inverter from the packaging box.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 17 of 52

Advertisement

Table of Contents
loading

Table of Contents