Installation
Figure 19 Cable Box with pre-wired Cables, Section View.
Step 11: Step 11: Open the cable box, open the decorative cover, connect the
backup/grid according to the illustration, then install the decorative panel and
connect the cable according to the illustration.
NOTE: The communication cables outside are not equipped with RJ45
connectors. The current of the breaker that connects the inverter must be
more than 25A.
Communication Baffle
Figure 20 Inverter with pre-wired Cables