Introduction; Main; Status - Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual

Energy storage system ess
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

Your Smart Energy

4.2 Introduction

This part is suitable for EMS firmware-version 1.01.97 and above.
4.2.1

Main

Figure 46 Main Interface
Figure 44 Main Menu
4.2.2

Status

Figure 45 Status Menu
Figure 46 Grid Interface
___________________________________________________________________
Page 40 of 52
EMS Introduction and Set up
Main displays the inverter working status
and information, including:
 Power: Total PV power
 Total: Total power generation.
 Battery:
 Normal: Current working state of
In the Main interface, press ENT key to
enter the Menu main interface.
Through the up and down key, select the
sub-menu, press the ENT key to enter the
select sub-menu, press Return key to
return to the previous layer.
Status menu contains five sub-menus:
Solar, Battery, Grid, UPS and Comm
display the relevant information about the
current
interface respectively.
Grid interface displays the real-time
information on the city electric side:
voltage U, current I, frequency F, P
P
, P
MeterAC
Alpha ESS Co., Ltd.
Current
battery power (SOC).
the
equipment,
Standby.
physical
or
communication
.
MeterDC
remaining
including
,
Inv

Advertisement

Table of Contents
loading

Table of Contents