4. Installation

4.1 Installation Precautions

The following sites are not allowed for installation:
A.
Sites which are salty and where humid air can penetrate.
B.
Flooded areas.
C.
Earthquake areas(additional security measures are required here).
D.
Sites that are higher than 3000 meters above the sea level.
E.
Sites that are in an explosive or potentially explosive atmosphere.
F.
Sites with extreme changes of ambient temperature.
G.
Sites with highly flammable materials or gases.
Note: The indoor temperature of the installation system is preferably between 15 ℃

4.2 Parts List

~25 ℃.
1 X Power Cable
420 mm, Black-Red, BAT-BAT
1 X Communication Cable
500 mm, BAT-HV Box
______________________________________________________________________
Product Description
Table 16 Parts List
M38210-S
1 X Communication Cable
350 mm, BAT-BAT
HV900105
1 X Communication Cable
2200 mm, HV Box - HV Box
Alpha ESS Co., Ltd.
Your Smart Energy
4 X M6
4 X M6*16
Gouding Serrated
Washer
4 X M6
4 X M6*16
Gouding Serrated
Washer