INSTALLATION
04
Installation
4.1 Installation Precautions
The following sites are not allowed for installation:
A.Sites which are salty and where humid air can penetrate.
B.Flooded areas.
C.Earthquake areas (additional security measures are required here) .
D.Sites that are higher than 3000 meters above the sea level.
E.Sites that are in an explosive or potentially explosive atmosphere.
F.Sites with extreme changes of ambient temperature.
G.Sites with highly flammable materials or gases.
NOTE: The indoor temperature of the installation system is preferably between 15℃
~25 ℃.
4.2 Parts List
Table 17 Parts List
810.10515-00
810.00033-00
1 X Power Cable
1 X Communication
Cable
130 mm, Black - Red,
BAT - BAT
280 mm, BAT - BAT
810.00048-00
410.00080-00
1 X Communication
4 X M6*16
Cable
680 mm, HV Box - HV
Box
M48112-S
411.00026-00
4 x M6
410.00080-00
Grounding Serrated
4 x M6*16
Washer
HV900112
410.50001-00
810.10553-00
4 X M6
AC Auxiliary Power
Grounding Serrated
Cable
Washer
7000 mm
20
21
810.90006-00
1 X Power Cable
2500 mm, Black -
Black, BAT - HV
810.00058-00
1 X Communication
Cable
2500 mm, TOP BMU -
HV
810.10644-00
1system: 1 x 4500 mm,
50mm2 Power Cable,
Black-Black, For
Junction box- INV (T50)
;
810.11000-00
1system: 1 x 4500 mm,
95mm2 Power Cable,
Black-Black, For
Junction box -
INV(T100)
810.90004-00
1 X Power Cable
130 mm, Red - Red,
BAT - HV
DC Junction box (With TOP BMU Box)
810.10412-00
410.00080-00
1 X Terminal
4 X M6*16
Resistance
810.10643-00
810.10611-00
2 cluster: 1 x Commu-
1 system: 1 x 4500
nication Cable
mm, 50mm2 Power
7500 mm EMS - INV
Cable,
Red-Red, For Junction
box - INV(T50);
810.10999-00
1 system: 1 x 4500
mm, 95mm2 Power
Cable,
Red-Red, For Junction
box - INV(T100);
INSTALLATION
411.00026-00
4 X M6
Grounding Serrated
Washer