Switch Off - Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual

Energy storage system ess
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

3.2 Switch off

Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
___________________________________________________________________
System Operation
Step 3: Turn on the PV switch on the cable box.
Step 4: Turn on the GR switch.
Step 5: If backup load is applied, connect it to
Backup ports and turn on the Backup switch; if
not, then keep the Backup switch off.
a backup load is applied.
Step 6: Turn on the Battery switch.
Step 7: Press button 1 on all the batteries, and
the indicator light 2 will be on.
Step 8: Close the inner cover and outer shell of
Cable box.
1
2
Open Cable box following the steps in 4.1 Step 1, 2.
Press button 1 on all the batteries, till the lights off.
Turn off the Battery switch.
Turn off the GRID switch.
If backup load is applied, turn off the Backup switch.
Alpha ESS Co., Ltd.
NOTE: the Backup switch is only used when
Your Smart Energy
Page 37 of 52

Advertisement

Table of Contents
loading

Table of Contents