Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 21

Energy storage system ess
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

Your Smart Energy
Step 6: Keep the battery against the wall, drill holes on the wall with an impact
drill.
NOTE: please make sure a layer of protection must be placed over the
battery while drilling, it could be paper, wood board or packaging bubble,
as Figure 14 shows).
The ground upon which the battery will be placed on must be less than 3
degree to the horizontal level.
___________________________________________________________________
Page 20 of 52
Installation
Debris Baffle
Figure 14 Battery Installation - Drill Holes
Alpha ESS Co., Ltd.
M8*60
M6 Gasket

Advertisement

Table of Contents
loading

Table of Contents