ADL-3000 three-phase connect (with CT, without meter plug), if applicable:
Figure 34 ADL-3000 three-phase Connect (with CT, without Meter plug)
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
ADL-3000 three-phase connect (with CT, with meter plug), if applicable:
Figure 35 ADL-3000 three-phase Connect (with CT, with Meter plug)
NOTE: CT connect, connect S1 to L1, S2 to L1'.
For AC-/ Hybrid-system, there are two meter needed:
Option 1: with Meter Plug
Figure 36 Two Meter Connect, with Meter
2.3.2

Meter SM60A (If Applicable)

___________________________________________________________________
Page 32 of 52
Plug
Alpha ESS Co., Ltd.
Installation
Option 2: without Meter Plug
Figure 37 Two Meter Connect, without Meter
Plug