Installation Planning
Framing Dimensions
NOTE
Use fo the optional HeatShift
System affects mantel and hearth
clearances. See HeatShift section in
Appendix D of this manual.
1/2" thick non-combustible
cement board required above,
on each side and below
engine opening (NOT supplied)
NOTE: This unit requires a
solid platform to support it.
Combustible framing allowed
appliance is installed directly
on carpeting, tile or other
combustible material other
appliance shall be installed
on a metal or wood panel
and recessed depth of the
appliance
HeatShift System MUST be installed
on this appliance when using
1730CIK—Clean Installation Kit!
NOTE: Height of cavity may be
- see page 15
WARNING
20"
No hearth required.
If using a hearth,
see page 11.
57-3/4"

Framing

Between underside
of header and bottom
43"