Split Wood Kit 1700Swk - Valor L2 1700KN Installation Manual

Direct vent zero clearance gas fireplace
Table of Contents

Advertisement

Installation

Split Wood Kit 1700SWK

Material required
• Black steel platform (supplied with appliance)
• Split Wood Kit, which contains:
• 1 bag of splinters
• 1 bag of small embers
• 11 logs
Installation
Platform
Carefully unpack the kit.
Install the steel platform around the burner as
indicated. The openings in the platform should be
underneath.
Installed platform
Logs, embers & splinters
• Some logs are marked with a number to facilitate the
installation.
• Some logs also have positioning pins underneath
which fi t into the SQUARE holes in the platform.
• Some logs straddle the burner.
Fuel Beds
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

L2 1700kp

Table of Contents