Framing - Valor L1 1500KN Installation Manual

Direct vent zero clearance gas fireplace
Table of Contents

Advertisement

Installation Planning
Framing Dimensions
NOTE
Use fo the optional HeatShift
System affects mantel and hearth
clearances. See HeatShift section in
Appendix D of this manual.
1/2" thick non-combustible
cement board required above,
on each side and below
engine opening (NOT supplied)
NOTE: This unit requires a
solid platform to support it.
Combustible framing allowed
beneath fireplace. When the
appliance is installed directly
on carpeting, tile or other
combustible material other
than wood flooring, the
appliance shall be installed
on a metal or wood panel
extending the full width
and recessed depth of the
appliance
WARNING
HeatShift System MUST be installed
on this appliance when using
1530CIK—Clean Installation Kit!
NOTE: Height of cavity may be
affected by vent configuration
page 15.
- see page 26

Framing

Between underside
of header and bottom
of firebox
43"
No hearth required.
If using a hearth,
page 11.
see page 22.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

L1 1500kp

Table of Contents