Installation; Appliance Preparation; Unpack Appliance; Fit Standoffs - Valor L2 1700KN Installation Manual

Direct vent zero clearance gas fireplace
Table of Contents

Advertisement

Installation

Unpack Appliance

Beware of sharp edges! Wear gloves!
1. Remove the cardboard wrapping and the wood pal-
let from the appliance and discard.
2. Unpack any loose items from around the appliance.
3. Remove the window and set aside in a safe place
to avoid damage—see"Remove Window" on page
32.
4. Verify that you have all the components re-
quired for the installation, including:
• approved cement board;
• liners and fuel bed (in separate cartons);
• trim kit with barrier screen;
• venting components and accessories;
• optional HeatShift system if used;
• electrical components if installing optional
decorative light wall switch or blower.
Fit Standoff s
The standoff s are supplied fl at on the fi rebox sides
and fi xed at one end. Swivel up the fl at standoff s, bend
them as shown and fi x the loose end to the top of the
fi rebox.

Remove Heat Shield

Remove the heat shield from the top of the appliance
case (3 screws). If using a rear outlet, keep the shield
to reinstall after converting the top to rear outlet—see
next subsection. If using the top outlet or the HeatShift
system, discard the shield.
Remove heat shield (3 screws)

Appliance Preparation

Standoff s installed
Standoff
Fold fl at
standoff s
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

L2 1700kp

Table of Contents