Chapter 2 - Overview - Honeywell ControlEdge 900R04-0200 Getting Started

Plc and rtu
Table of Contents

Advertisement

CHAPTER
2
OVERVIEW
This document introduces an example for a redundant ControlEdge
900 controller connected with 4-slot, 8-slot and 12-slot expansion I/O
racks, and a redundant ControlEdge 2020 controller, to get you
quickly set up the hardware, connect and configure the controller
from ControlEdge Builder.
This document does not provide any detailed instructions. Please
refer to other related documents, and online helps embedded in
ControlEdge Builder for more information.
Make sure all the hardware modules used in the system are installed
with the right firmware version and the engineering station has the
latest ControlEdge Builder. You can find the firmware and software
updates on http://honeywellprocess.com with valid credentials. 
See the following example of system architectures for ControlEdge
PLC and ControlEdge RTU.
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents