Honeywell ControlEdge 900R04-0200 Getting Started page 63

Plc and rtu
Table of Contents

Advertisement

4.
Select the desired programming Language. Depending on your
system configuration, some programming language are possibly
not available.
5.
Enter a
PLC type
6.
Click
, the new POU is inserted in the project tree. It contains
OK
one code worksheet in the chosen language, a variable worksheet
and a description worksheet.
7.
Expand the POU, and double-click the code worksheet, the
workplace appears.
8.
Drag the target function or function block from the Edit Wizard
pane, and the function or function block is displayed.
9.
Double-click the pin-outs of the function or function block, the
Variable Properties
10.
Accept the proposed name, or enter a new name or select an
already existing name from the
11.
Select the
Data Type
If you are creating a Program, there are two options for Usage:
l
VAR and VAR_GLOBAL.
If you are creating a Function Block, there are five options for
l
Usage: VAR, VAR_INPUT, VAR_OUTPUT, VAR_IN_OUT and VAR_
GLOBAL.
If you are creating a Function, there are two options for Usage:
l
VAR and VAR_INPUT.
See the following table for the description of variables.
Variable
VAR
VAR_GLOBAL
VAR_INPUT
VAR_OUTPUT
VAR_IN_OUT
12.
Assign the initial value and I/O address.
13.
It is optional to select the target group from
Click
and the new variables are added to the selected groups.
OK
and/or a
Process type
dialog appears.
Name
and
from the drop-down lists.
Usage
Description
Local variable
Global variable
Local FB input variable
Local FB output variable
Local input/output variable
Chapter 4 - Software
if required.
combo box.
Global Variable Groups
.
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents