Panasonic LP-GS Series Setup & Maintenance Manual page 43

Laser marker
Hide thumbs Also See for LP-GS Series:
Table of Contents

Advertisement

4.
Connect the three wires to the terminals.
The signs of "L (black)", "N (white)" and "PE (GND) (yellow/green)" show in
the cables. Connect each cable to the appropriate terminal.
Screw size: M4
Tightening torque: 1.2N·m
• Connect the attached AC power cable (AC power supply cable).
• Attached AC power cable varies depending on each model. Please select a
cable compliant with the standards in the country or region where it is used.
5.
Attach the resin cover to the terminal and screw the terminal
cover.
Screw size: M3
Tightening torque: 0.5N·m
6.
Fix the AC power cable with the clamp.
Screw size: M4
Tightening torque: 1.0N·m
• Locate the AC power cable beside the fan. Locating it in front of the fan
may impair the air-cooling performance, leading to the device failure.
7.
Make sure that the cables and connectors other than the power supply are connected and then
connect the AC power cable to the AC power supply.
Power voltage: 90V to 132V AC or 180V to 264V AC (including ±10% voltage fluctuations; automatic switching)
• The earth terminal of the AC power cable must be permanently grounded.
• Set each connecting cable away from the device that generates high voltage, power line, and large switching surge as
far as possible. If there may be any noise effect on the power supply, use the noise cut-off transformer.
ME-LPGS-SM-8
L N
43

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents