Pausing Build; Resuming Build From Pause Mode; Resuming Operations From Standby Mode; To Continue Operation From Standby Mode - Stratasys Prodigy Plus User Manual

Table of Contents

Advertisement

36 Operation

Pausing Build

While building a part, you may want to pause operations for some
reason, such as to replace a material cartridge. To pause the build
operation at any time, press Pause. On your workstation, Status
displays the following information:
Pause status
Modeler's name
Type of modeler (Prodigy Plus)
Job name
Build time remaining
Percentage of part built
When the build process is paused, Prodigy Plus
completes the current tool path before pausing.

Resuming Build from Pause Mode

If you have pressed Pause, and are ready to resume building the
part, press Resume. Prodigy Plus resumes modeling.
Resuming Operations from Standby
Mode
After several minutes of inactivity, Prodigy Plus enters Standby
mode. During Standby, the head and build envelope temperatures
lower to save energy.

To continue operation from Standby mode:

1. Press Resume.
The panel displays Ready to build and your part's
name (if there is a part in the queue). It also shows the
amount of material remaining in the model material
cartridge and the support material cartridge (e.g. Mod 90
%, Sup 85 %).
Start Model begins blinking.
Prodigy Plus User Guide
Note

Advertisement

Table of Contents
loading

Table of Contents