3 4 O X _ 3 0 - 1 6 0 0 r e v. B / 1 S C C 3 0 3 0 1 1 M 0 2 0 1

3.6 Using Level 2 (DIP) control interface HMI

3.6.1 Keypad
S1 Failure
S1 Return
delay [s]
delay [min]
1
2
0
2
4
10
1
3
5
15
S1
Off
l
Lamp
load
load
test
test
LOAD
l
ON
Auto
In-phase
config
monitor
Start
On
Ok
Off
6
Dropout ΔU / Δf
OXB_, delayed transition, I - O - II
S1 Failure
S1 Return
delay [s]
delay [min]
1
2
0
2
4
10
1
3
5
15
Off
Lamp
load
test
test
l
ON
6
OXA_, open transition, I - II
Fig. 3.8 Keypad in Level 2 HMI with DIP-switches
3
4
5
20
30 s
0 s
30
4 min
4 s
S2
On
ll
Bypass
!
Auto
time
Alarm reset
test
delay
AUTO
O
ll
OFF
ON
Priority
Manual
retransfer
No priority
On
Source 1
Off
8
7
ΔU 5% / Δf 5%
ΔU 10% / Δf 5%
ΔU 15% / Δf 10%
ΔU 20% / Δf 10%
Generator
stop delay
3
4
5
30 s
20
30
4 min
On
Bypass
Auto
load
time
Alarm reset
test
delay
ll
ON
7
1
Lamp test: Turns on all LEDs
simultaneously to confirm all LEDs
are operational
2
Off load test: Initiates off load test
(Starts generator but does not
transfer the load to the generator)
3
On load test: Initiates on load test
(Starts the generator and transfers
the load to the generator)
4
Bypass time delay: Bypass any
currently running time delay
5
Auto (Alarm reset): In the event of
active switch control alarm (open I
failure, close I failure, open II failure,
close II failure), resets to no alarm
state. If no active alarms, toggle
between automatic/HMI control
modes
6
I ON: Operate switch to I position
7
II ON: Operate switch to II position
8
O OFF: Operate switch to O position