ABB TruONE ATS Installation And Operating Instruction page 66

Automatic transfer switches
Table of Contents

Advertisement

66
Tr u O N E ® AT S , I N S TA L L AT I O N A N D O P E R AT I N G I N S T R U C T I O N
Measurements
Switch Diagnostic
Total operations
Manual operations
Number of load transfers
Transfer time
Source fail transfers
Days energized
Total time on S1
Total time on S2
Time S1 available
Time S2 available
Last generator start
Generator starting time
In-phase time
Event Log
Harmonics
Measured
Phase
Voltage
Power Factor
I-O-II switches: Total number of transfers I-O, O-II,
II-O and O-I.
I-II switches: Total number of transfers I-II and II-I
Total transfers operated by the handle.
Total number of transfers I-II and II-I
Time it took to transfer the load between sources
(ms)
Total number of automatic transfers due to source
failures.
Hours
Hours
Minutes
Minutes
MMM DD, YYYY hh:mm:ss
How long it took for the generator to become
acceptable after latest start (s).
How long it took for the in-phase monitor to
achieve synchronized transfer (s).
250 time stamped events, latest first.
Harmonic components up to 15th are calculated
for the selected phase.
Disabled*
Phase 1
Phase 2
Phase 3
Total distortion
THD for each phase of both voltage sources.
Each harmonic component of the selected S1
S1 Components
phase.
Each harmonic component of the selected S2
S2 Components
phase.
Enabled only when current measurement module is
connected.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents