ABB TruONE ATS Installation And Operating Instruction page 53

Automatic transfer switches
Table of Contents

Advertisement

3 4 O X _ 3 0 - 1 6 0 0 r e v. B / 1 S C C 3 0 3 0 1 1 M 0 2 0 1
Settings
(continued)
Standard I/O Settings (continued)
O 01 (continued)
Function (continued)
Contact
type
Modules (See Chapter 5, Electronic accessories)
System
RESET to Factory Setting
Date
1)
Time
1)
Language
New Password
Temperature Unit
Clock Format
Display Contrast
1)
RTC capacitor must be charged before inserting Date/Time. RTC capacitor is charged from source voltage (not AUX)
and takes about 10 minutes. RTC capacitor keeps the date/time saved for 48 h in case of no source voltage available.
Pre-transfer Signal
Source 1 Available
Source 2 Available
Load Shed 1
Elevator pre-signal
NC
NO*
English*
Italian
French
German
Spanish
Russian
Chinese
Celsius*
Fahrenheit
24 h*
12 h
10 - 100% (30 %*)
Signal is activated and transfer is delayed according
to pre-transfer delay. Signal is kept activated
according to post-transfer delay after transfer.
No anomalies in S1 voltage supply.
No anomalies in S2 voltage supply.
Used for shedding non-essential loads before
transferring to non-priority source. Signal is
activated before transferring to non-priority source
according to load shed delay and kept activated until
load is transferred back to priority source.
Signal is activated and transfer is delayed according
to Elevator pre-signal delay. Signal is kept activated
according to Elevator post-signal delay after
transfer.
Active open.
Active closed.
Restore default parameter values.
Month day, year
Hours:Minutes
Five digits
53
*Default

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents