Danfoss VLT Brook Crompton Motor FCM 300 Design Manual page 66

Table of Contents

Advertisement

Programming
3
3
Bit
Bit = 0
00
OFF 1
01
OFF 2
02
OFF 3
03
Motor coasting
04
Quick-stop
05
Freeze output frequency
06
Ramp stop
07
No function
08
Jog 1 OFF
09
Jog 2 OFF
10
Data not valid
11
No function
12
No function
13
Setup 1
14
15
No function
Table 3.23
NOTICE
The use of Bit 00, Bit 01 and Bit 02 for switching off the
power supply (by use of relay) will require a separate
power on. This because there is no 24 #V external
connection to supply the FCM 300 control, which is
required to activate the FCM 300 again via input signal.
Bit 00, OFF1/ON1
An ordinary ramp stop which uses the ramp time in
parameters 207/208. Bit 00 = "0" leads to a stop. Bit 00 =
"1" means that the frequency converter will be able to
start if the other conditions for starting have been fulfilled.
Bit 01, OFF2/ON2
Coasting stop. Bit 01 = "0" leads to a coasting stop. Bit 01
= "1" means that the frequency converter is able to start,
provided the other conditions for starting have been
fulfilled.
Bit 02, OFF3/ON3
Quick-stop, which uses the ramp time in parameter 212.
Bit 02 = "0" leads to a quick-stop. Bit 02 = "1" means that
the frequency converter is able to start, provided the other
conditions for starting have been fulfilled.
Bit 03, Coasting/enable
64
®
VLT
DriveMotor FCM Series
Coasting. Bit 03 = "0" leads to a stop. Bit 03 = "1" means
that the frequency converter is able to start, provided the
other conditions for starting are fulfilled.
NOTICE
In parameter 502 the choice is made as to how bit 03 is
Bit =1
to be combined (gated) with the corresponding function
ON 1
in the digital inputs.
ON 2
ON 3
Bit 04, Quick-stop/ramp
Enable
Quick-stop which uses the ramp time in parameter 212. Bit
Ramp
04 = "0" leads to a quick-stop. Bit 04 = "1" means that the
Ramp enable
frequency converter is able to start, provided the other
Start
conditions for starting are fulfilled.
Reset
ON
NOTICE
ON
In parameter 503 the choice is made as to how bit 04 is
Valid
to be combined (gated) with the corresponding function
Slow down/Relay 123/
on the digital inputs.
Digital output terminal
9
Bit 05, Freeze output frequency/ramp enable
Catch-up/Relay 123
Bit 05 = "0" means that the given output frequency is
Setup 2
maintained even if the reference is changed. Bit 05 = "1"
means that the frequency converter is again able to
Reversing
regulate, and the given reference is followed.
Bit 06, Ramp stop/start
An ordinary ramp stop that uses the ramp time in
parameters 207/208. Bit 06 = "0" leads to a stop. Bit 06 =
"1" means that the frequency converter is able to start,
provided the other conditions for starting have been
fulfilled.
NOTICE
In parameter 505 the choice is made as to how bit 06 is
to be combined (gated) with the corresponding function
on the digital inputs.
Bit 07, No function/reset
Reset of trip. Bit 07 = "0" means that there is no reset. Bit
07 = "1" means that a trip is reset. After reset it will take
approx. 1.5 second until the unit is ready. The status word
will indicate the ready state.
Bit 08, Jog 1 OFF/ON
Activation of pre-programmed speed in parameter 509
(Bus JOG 1). JOG 1 is only possible when Bit 04 = "0" and
bit 00-03 = "1".
Bit 09, Jog 2 OFF/ON
Activation of pre-programmed speed in parameter 510
(Bus JOG 2). JOG 2 is only possible when Bit 04 = "0" and
Bits 00-03 = "1". If both JOG 1 and JOG 2 are activated
(Bits 08 and 09 = "1"), JOG 1 has the higher priority, which
®
MG03BA02 - VLT
is a registered Danfoss trademark

Advertisement

Table of Contents
loading

Table of Contents